Blog›Setup

Live in a day, not a quarter

2 min read

Most of what new operations software costs is configuration (forms, workflows, permissions), not the software. Describe what you need, review the draft, and setup stops being a project phase.

www.tebelis.ai/templates
Describe the form and its workflow, then review the draft.

What setup usually costs

Rolling out a platform for inspections, audits, rounds and sign-offs is mostly configuration, not software. Scoping workshops. Someone builds the forms. Someone wires the workflows and approvals. Someone maps who can see what. Then a rollout, training, and a backlog of change requests as the real world disagrees with the plan. A serious deployment means weeks of work, often a paid consultant, and a quarter of calendar time before the first useful record.

What makes it slow is that every structural decision is expensive to make and expensive to change. So teams over-think the first version and rarely revise it afterwards.

Describe it, then review it

With the agent, you start from a draft instead of a blank page. A quality lead says "build a deviation report with a severity classification, a root-cause section that only appears when severity is major, and a two-step review: quality first, then the department head signs off". The agent drafts the fields, the conditional rule, the workflow states and their owners, and you review, adjust and publish. A facilities manager describes a weekly plant-room round the same way, and a site engineer a concrete-pour inspection with a hold point before the pour.

Restructuring costs a sentence instead of a change request, so you can try things rather than plan everything up front. The same agent also sets up your projects, your location hierarchy (Campus → Building → Floor → Room, or whatever fits your sites), your organisation tree, your people and groups, and your first dashboards. You review each piece as it lands, and form templates stay drafts until you publish them.

Start from what you already have

Most teams already have their forms in Excel and PDF, and those forms hold years of hard-won process: the cleanroom entry checklist, the planned-maintenance round a building team has run for a decade. Upload one and the agent turns it into a draft template. It reads the layout, works out the field types, and gives you something to refine instead of retyping it.

(For reports from people who'll never have a login, see public form links.)

Keeping up after go-live

Because changing the structure is cheap, the system keeps up with the work. A new deviation category after an audit finding. An extra check on the maintenance round when a boiler model changes. A tighter sign-off step a client insists on. Each takes minutes rather than a ticket, and versioning keeps records already in progress on the version they started with (the workflows post explains how).

Once the structure is live, the bottleneck moves to data entry. That's the next post: The fastest form is the one you barely fill in.

Try the Tebelis agent in your own workspace.